General contracting & maintenance · Abu Dhabi
Built to the drawing. Handed over on the date.
Commercial buildings, community facilities, villas and maintenance contracts across the UAE. One accountable team from mobilization to handover, and after it.
- On site now
- Saadiyat Island, Abu Dhabi
- Head office
- MBZ City, Abu Dhabi
- Abu Dhabi time
- --:--

- S-01Commercial buildingsOffices, retail and mixed-use buildings, built to specification and schedule.
- S-02 · On siteCommunity facilitiesNon-residential buildings for communities and public use, coordinated with consultants and authorities.
- S-03Villas and compoundsPrivate villas and multi-unit compounds, built to one quality standard.
- S-04MEP worksMechanical, electrical and plumbing works, coordinated with the main build.
- S-05Fit-out and finishingInteriors and finishes delivered by the same team that built the shell.
- S-06Maintenance contractsPreventive and reactive maintenance, with a 24/7 response line.
Track record
The record, in numbers.
On site now: works packages on community and commercial buildings in a new master-planned district on Saadiyat Island, Abu Dhabi, for the main contractor. Project references are shared with clients at prequalification.
- 24+years in UAE contracting
- 120+villas and buildings handed over
- 98%handed over on schedule
- 24/7maintenance response
How we work
Seven steps. The same on every project.
Each step leaves a record you can point at, from the tender to the handover.

- 01Tender & enquiryTender documents, drawings, specifications and BOQs, reviewed as one set.
- 02EstimationSite visit, RFIs, buildability and pricing by our engineering and QS team.
- 03Tender submissionTechnical and commercial proposal, with clarifications and exclusions.
- 04ProcurementMaterial submittals, approved subcontractors, long-lead items ordered against the programme.
- 05ConstructionSite engineering, daily HSE and coordination with the Consultant.
- 06QA/QCITPs, WIR/MIR inspections and NCRs closed at every stage.
- 07HandoverTesting and commissioning, snagging and de-snagging, as-built drawings and warranties.
- Structured procurementPre-qualified suppliers and subcontractors tied to the programme before mobilization.
- Daily site controlsEngineering supervision, daily HSE briefings and checks at the work front.
- Documented approvalsMaterial submittals and inspection requests (WIR/MIR) recorded at every stage.
- Open reportingCost, schedule and risk updates, so a delay never arrives as a surprise.
Coverage
Based in Abu Dhabi. Measured from there.
One site team, one supply chain and one reporting line, in every emirate.

- Dubai≈ 130 km
- Al Ain≈ 140 km
- Sharjah≈ 165 km
- Ajman≈ 175 km
- Umm Al Quwain≈ 200 km
- Ras Al Khaimah≈ 250 km
- Fujairah≈ 270 km
Approximate road distance from head office, km. Directions are true; the drawing is a schematic, not a map.
Start a project
Tell us the job. We review the scope and reply.
Each answer redraws the job beside the form. The massing is an example, not a design; every figure on it is measured from it.

Supply or subcontract to Al Yazeem.
We welcome suppliers of materials, MEP, finishes, labor and equipment. Registration puts you on our pre-qualified list.
Register as a supplierWork on live projects.
We hire engineers, supervisors and trades. Send your details once; we contact you when a role matches your discipline.
See careers