Services · Sheet 01

Six services. One accountable team.

From the structure to the maintenance contract, one contractor carries the programme, the records and the reporting line.

  1. S-01Commercial buildings
  2. S-02 · On siteCommunity facilities
  3. S-03Villas and compounds
  4. S-04MEP works
  5. S-05Fit-out and finishing
  6. S-06Maintenance contracts

S-01

Commercial buildings

Offices, retail and mixed-use buildings, built to the Consultant's specification and the authority approvals.

Scope

  • Civil and structural works
  • Blockwork, envelope and facade coordination
  • MEP integration with specialist subcontractors
  • Tenant fit-out packages
  • Testing, commissioning and handover documents

Questions

Do you work as main contractor or on packages?

Both. We deliver complete buildings for owners and developers, and works packages for main contractors.

Who prepares the authority submissions?

We prepare and submit the documents for the Consultant's and authority approval as part of the works.

S-02 · On site

Community facilities

Non-residential buildings for communities and public use, coordinated with consultants and authorities.

Scope

  • Structure and building envelope
  • MEP and fire and life safety (FLS) systems coordination
  • Material submittals with Estidama documentation
  • Inspection and test plans agreed with the Consultant
  • Phased handover to the operator

Questions

Do you work to Estidama requirements?

Yes. Material submittals carry the Estidama documentation the Consultant needs to review them.

Can you work beside other contractors on one site?

Yes. Most community sites have several packages running at once; we plan interfaces and access with the main contractor.

S-03

Villas and compounds

Private villas and multi-unit compounds, built to one quality standard.

A two-story private villa on its walled plot, handed over: the frame and floors, the roof units, windows and doors, the boundary wall with its gates, paving and a pool.
Click the villa to lift its floors apartTap the villa to lift its floors apart
TitleVilla sequence
StageHanded over
Sheet01.3
ScaleNTS

Scope

  1. 01Foundations and structure
  2. 02MEP works
  3. 03Joinery, marble and finishes
  4. 04External works and boundary walls
  5. 05Authority and utility coordination

Questions

How long does a villa take?

Most private villas take 12 to 18 months from mobilization to handover, depending on size, specification and approvals.

S-04

MEP works

Mechanical, electrical and plumbing works, coordinated with the main build.

A six-story building cut open: hatched slabs and walls, and in every ceiling void the supply and return ducts, chilled-water pipes and a sprinkler main, with the risers and the air-handling unit on the roof.
Drag across the building to move the cutSwipe sideways to move the cut
TitleSection 1–1
Cut at—
Sheet01.4
ScaleNTS

Scope

  • Shop drawings and services coordination
  • Installation by our teams and specialist subcontractors
  • Testing and commissioning, witnessed by the Consultant
  • As-built drawings and O&M manuals

Questions

Do you coordinate specialist MEP subcontractors?

Yes. We bring specialist subcontractors into one programme and one set of coordinated drawings.

S-05

Fit-out and finishing

Commercial, retail and hospitality interiors, and finishes on new and existing buildings.

A commercial floor plate on its structural grid, with its core and columns; one grid area, C–D / 3–4, is marked as the mock-up area.
Pick a scope line to run that stepTap a scope line to run that step
TitleMock-up first
StatusNot started
Areas finished0 / 11
Sheet01.5

Scope

  • Samples and mock-ups approved before work at scale
  • Ceilings, partitions, flooring and joinery
  • Renovation of occupied buildings
  • Snagging and de-snagging to the Consultant's acceptance

Questions

Can you work in an occupied building?

Yes, with phased work areas, safety segregation and out-of-hours work where needed.

S-06

Maintenance contracts

Preventive and reactive maintenance for residential, community and commercial assets.

Scope

  • Annual maintenance contracts (AMC)
  • HVAC, electrical, plumbing and civil repairs
  • 24/7 reactive response line
  • Asset records and maintenance reports

Questions

What does an annual maintenance contract cover?

Planned preventive visits and reactive call-outs, with response times agreed per asset and system.

The difference

One partner, from the structure to the maintenance contract.

In a typical setup the client manages five lines: the structure, the MEP, the finishes, the maintenance and the authorities. With Al Yazeem it is one.

  • Contracts to manage1with Al Yazeem, against 5 in a typical setup
  • Reporting lines1with Al Yazeem, against 5 in a typical setup
What mattersAl YazeemTypical setup
AccountabilityOne partner for construction, MEP, finishing and maintenance.Split across several contractors.
ReportingRegular progress, cost and schedule updates to clients and consultants.Updates on request.
After handoverSupport through the defects liability period, then a defined maintenance team.The relationship usually ends at handover.
AuthoritiesDirect coordination with consultants and authorities throughout.Often left to the client.
Supply chainPre-qualified subcontractors and suppliers, tied to the programme.Assembled per project; quality varies.

Discuss a project

Send us the scope and drawings. We review the scope and reply.

Discuss a project